A planned preventative maintenance contract sets out which assets are visited, how often, what is checked, and what record is produced. Its value is partly the servicing itself and largely the compliance calendar – knowing that statutory checks happen before they expire rather than after somebody notices.
What a PPM contract is actually buying you
Three things, in ascending order of value.
- The maintenance itself. Filters, services, cleaning, adjustment. Real, and the least interesting part.
- Reduced failure rate and failure cost. A component replaced on a planned visit costs a fraction of the same component replaced at two in the morning with a kitchen shut and a call-out premium running.
- Compliance certainty. Somebody else owns the calendar. Statutory checks happen before they lapse, the certificates arrive in a form your insurer and your auditor will accept, and when someone asks for the last three years of records you can produce them the same day.
For most commercial clients the third of those is the reason the contract exists. Maintenance is a cost line; a missed statutory check is a different category of problem entirely.
What we cover
| Asset | Typical frequency | What it produces |
|---|---|---|
| Commercial gas appliances and plant | Annual as a minimum, more for heavy use | Gas safety record and service record |
| Catering gas and interlocks | Annual, with the ventilation interlock proven | Safety record plus interlock test record |
| Oil-fired plant and storage | Annual service, plus tank inspection | Service record with combustion readings |
| Air conditioning and refrigeration | One to two visits a year depending on duty | Service record, plus F-Gas records where applicable |
| F-Gas leak checking | Frequency set by the CO2e of each system | Logbook entries and leak check records |
| Hot and cold water services | Per the written control scheme | Temperature monitoring and inspection records |
| Unvented cylinders and calorifiers | Annual | Service record, safety devices verified |
| Washrooms and sanitary plumbing | Scheduled inspection | Condition report and defect list |
| Pumps, boosters and pressure sets | Annual or per manufacturer | Service record |
| Drainage and grease management | Per usage – catering sites need more | Inspection record |
The schedule is built from your asset list, not from a template. A site with a catering kitchen and a comms room has a very different calendar from an office with a boiler and two washrooms, and pretending otherwise produces either wasted visits or missed obligations.
How we set one up
- Asset surveyEvery relevant asset identified, recorded, located and photographed: make, model, serial, age, condition, refrigerant type and charge where applicable, and where the isolation is. A surprising number of sites do not have this.
- Statutory obligations mappedWhat the law requires for each asset, at what frequency, and who is responsible for it. This frequently identifies obligations nobody was aware of – F-Gas leak checking and water hygiene are the two that come up most.
- Schedule builtVisits planned around your operating hours. Kitchens serviced between services, retail out of trading hours, schools in holidays, offices at weekends where it matters.
- Scope agreed in writingWhat is included, what is excluded, what constitutes a chargeable extra, and what the response arrangement is for anything outside the plan.
- Records structuredWhere certificates live, who gets them, and in what format – so they are usable when someone asks rather than scattered across email.
- ReviewThe schedule is reviewed as assets change. A site that installs a new plant room mid-contract needs the calendar updating, not a note in a drawer.
A great many commercial sites cannot say with confidence what plant they have, where it is, how old it is, or what refrigerant is in it. That is a compliance problem before it is a maintenance problem – you cannot calculate F-Gas leak check frequency without knowing the charge, and you cannot budget for replacement without knowing the age. The register is often the most immediately useful thing a contract produces.
Working around your business
The practical difference between a contractor who understands commercial work and one who does not is almost entirely about scheduling and conduct on site.
- Out of hours where it matters. A restaurant serviced during service is not being serviced, it is being disrupted.
- Term dates for education. Safeguarding requirements, and access that only exists in holidays.
- Notice periods that suit you, not a message the morning of.
- Engineers who look like they belong there. Identifiable, briefed on site rules, and able to sign in properly.
- Risk assessments and method statements provided in advance where your site requires them.
- One point of contact, so you are not explaining the site to a different person each visit.
- Honest reporting. If a visit finds something outside scope, you get told what it is and what it needs, not a surprise invoice.
Accreditations and insurance
We will provide current insurance certificates and evidence of competence on request, and we would rather you asked for them than assumed. Where a client’s procurement process requires a specific third-party accreditation scheme, tell us at the outset – it is better to establish that early than partway through a tender.
We are a Norfolk business and we are honest about our scale. We are a good fit for single sites, small portfolios and regional clients who want to deal with the people doing the work. We are not the right answer for a national multi-site framework, and we will say so rather than over-promise and under-deliver.
Want to know what you are actually obliged to do? The asset survey answers that, and it is useful whoever ends up holding the contract.
Questions we get asked about this
What is the difference between planned and reactive maintenance?
Planned maintenance is scheduled work to keep assets running and obligations met. Reactive is responding to failure. Most sites need both – the aim of a PPM contract is to shift as much as possible into the planned column, where it is cheaper and less disruptive.
Do I have to use you for reactive work as well?
No, though most clients find it simpler. A PPM contract usually comes with a defined response arrangement for failures – see reactive call-out and SLAs.
How long are contracts?
Typically annual, aligned to your statutory cycles so certificates renew together. We would rather have a client who stays because the service is good than one held by a long notice period.
What if we do not know what plant we have?
That is extremely common and it is exactly what the asset survey is for. We will record everything, including the things nobody remembered, and give you the register whether or not you go ahead with a contract.
Can you work around our opening hours?
Yes, and for most commercial clients that is the point. Kitchens, retail units and schools all have windows when work is possible and windows when it is not, and the schedule is built around them.
Do you provide RAMS?
Yes. Risk assessments and method statements are provided in advance where your site requires them, and our engineers work to them.
Regulations and standards referenced on this page
- Regulation (EU) No 517/2014 on fluorinated greenhouse gases, as retained and amended in GB law — UK Statute Law Database
- Fluorinated gases (F gases): guidance for operators and engineers — Environment Agency / Defra
What happens when you call
Call and describe it
You speak to an engineer, not a call centre. Most jobs can be narrowed down on the phone.
We look at it properly
A real diagnosis before a price, and a straight answer if it is not worth doing.
A written quote
Itemised, so you can see what you are paying for.
The job, and the paperwork
Certificates where the work needs them, and what will need attention next.
Where we do this work
Across Norwich and the whole of Norfolk. If you are on the edge of the county, call and ask — we will tell you honestly whether we are the right people.
- Norwich
- Wymondham
- Dereham
- Attleborough
- Aylsham
- North Walsham
- Cromer
- Diss
- Loddon
- Long Stratton
- Watton
- King's Lynn
Need this doing?
Call and describe the problem — you will speak to an engineer, not a call centre. Written quotes, no estimates over the phone.