Bathrooms

Bathroom underfloor heating

Electric mat or wet loop under tile. Warm floors on a cold morning, and it frees the wall the radiator was on.

Short answer

For one bathroom, an electric mat under the tile is simpler, thinner and cheaper to install than a wet loop. Running cost is higher per unit, but the hours are short. A wet system makes sense when the whole floor level is coming up anyway.

Electric or wet, for one room

Electric mat Wet loop
Floor build-up A few millimetres Considerably more, unless routed in a screed already being laid
Install complexity Low – mat, sensor, thermostat Higher – manifold, flow and return, balancing
Install cost Lower Higher for one room
Running cost per unit of heat Higher – electricity Lower where fed by an efficient heat source
Hours run Short, usually timed around the times the room is used Longer, lower temperature
Suits One bathroom, a retrofit, a floor that cannot rise much A whole floor being rebuilt, an extension, a heat pump house
Repairability Difficult – it is under the tile Difficult – it is under the floor

For a single bathroom being retiled, the electric mat wins on nearly every practical count. For a room where the floor is coming up to structural level anyway, or where the rest of the house is on a wet system and the heat source is efficient, a wet loop is worth pricing – see underfloor heating.

The heat pump case is different

A house on a heat pump wants low flow temperatures, and underfloor heating is the ideal emitter for that. If a heat pump is in the plan, a wet loop in the bathroom is worth considering even though electric would be simpler, because it fits the rest of the system.

What underfloor heating in a bathroom is actually for

It is worth being clear about this, because it affects the specification.

  • Comfort underfoot is the primary reason, and a floor that is merely not cold achieves most of it.
  • Heating the room is a secondary question. A mat can be the primary heat source in a small, well-insulated bathroom, and frequently it cannot – particularly where a large share of the floor is occupied by a bath, a shower tray and a vanity unit, none of which can be heated under.
  • Drying the floor between uses, which is a genuine benefit in a family bathroom.
  • It does not dry towels. That is a towel rail’s job, and it is why most bathrooms end up with both – see towel rails.

The calculation that matters is the heated area, not the room area. Measure what is actually left once the bath, the shower tray, the WC and any fitted furniture are deducted. In a small bathroom that can be less than half the floor, and it decides whether the mat can carry the room or whether a radiator or towel rail is still needed.

Build-up, and why it matters more than anything

The floor height is the constraint people discover late.

  1. Decoupling or insulation board under the mat, which is what stops the heat going downwards into the joists or the slab and makes the system respond quickly. Skipping it is the commonest way to end up with a floor that takes an hour to warm and costs more to run.
  2. The mat itself, which is thin.
  3. Tile adhesive, which must fully encapsulate the cable with no voids – an air pocket over a heating cable is a hot spot and a failure point.
  4. The tile.

Added together that is a real dimension, and it has consequences: the door may need trimming, the threshold to the landing changes, and on a timber floor the deflection matters – a floor that moves cracks tiles and can damage a cable. Suspended timber floors frequently need additional noggins or an overboard before tiling.

On a solid floor, insulation board underneath is even more worthwhile, because a concrete slab is an enormous heat sink that will happily absorb everything the mat produces.

Installation, and the two tests

  1. Survey and calculateHeated area after deductions, heat loss for the room, and whether the mat can carry it or is a comfort layer alongside another emitter.
  2. Check floor construction and levelsDeflection on timber, and the build-up the door and threshold will tolerate.
  3. Insulation or decoupling boardBonded down properly.
  4. Test the mat before layingResistance and insulation resistance, recorded.
  5. Lay the matTo the planned layout, keeping clear of the areas that will be under fixed items – a cable under a bath or a fitted unit cannot dissipate its heat and will fail.
  6. Set the floor sensorIn a conduit, between cable runs, not touching a cable, and routed so it can be replaced from the thermostat position if it fails. This is the single most useful detail on the whole job and it is routinely skipped.
  7. Test againAfter laying, before adhesive.
  8. TileFull encapsulation, no voids.
  9. Test a third timeAfter tiling, before commissioning. A cable damaged during tiling is found now rather than in six months.
  10. Electrical connection and thermostatBy an electrician, to the requirements for a bathroom, with the thermostat sited outside the room or in a permitted position.
  11. Commission graduallyAdhesive and grout need their full cure before any heat is applied – rushing this cracks the floor.
Put the sensor in a conduit

Floor sensors fail, and when one fails in a floor with no conduit the choice is a thermostat running on air temperature only or lifting tiles. In a conduit it is a ten-minute replacement. It costs almost nothing to do at the time.

Controls and running it sensibly

  • A programmable thermostat with a floor sensor is the standard, and the floor sensor is what protects the floor covering as well as controlling the room.
  • Set a floor temperature limit appropriate to the covering. Tile and stone tolerate more than engineered timber or vinyl, and exceeding the covering’s limit damages it.
  • Timed to the times you use the room, with a warm-up period. Adaptive thermostats learn how long the floor takes and start accordingly.
  • Do not run it continuously on the assumption it is cheaper. With insulation board underneath the response is quick enough that timed operation is both cheaper and perfectly comfortable.
  • Keep a record of the mat make, model, wattage and layout, and the test results. If it ever needs fault-finding, that paperwork is what makes it possible.

Electrical work in a bathroom is subject to its own requirements around zones and protective measures, and a thermostat generally cannot be sited inside the room unless it is a type permitted there. That is an electrician’s call and it is part of the design rather than an afterthought.

Retiling a bathroom? That is the moment to decide about a mat – it cannot be added afterwards without doing it again.

Call 07506 070316

Questions we get asked about this

Electric or wet underfloor heating for a bathroom?

For one bathroom being retiled, electric – thinner, simpler, cheaper to install. A wet loop makes sense where the floor is coming up to structural level anyway, or where the house is on a heat pump.

Is it expensive to run?

Per unit of heat electricity costs more than gas or oil, but bathroom mats run for short timed periods over a small area. With insulation board underneath the response is quick, which is what keeps the hours down.

Can it be the only heating in the bathroom?

Sometimes, in a small well-insulated room. Calculate the heated area after deducting the bath, shower tray, WC and fitted units – it is frequently less than half the floor, which decides it.

Will it dry my towels?

No. That is a towel rail’s job, which is why most bathrooms end up with both.

How much will it raise my floor?

Insulation board, mat, adhesive and tile together make a real dimension. It affects the door and the threshold, so it is worth establishing before committing.

What happens if it fails?

A cable fault under tile is difficult. A sensor fault is trivial if the sensor is in a conduit and awkward if it is not – which is why the conduit matters so much.

How it works

What happens when you call

01

Call and describe it

You speak to an engineer, not a call centre. Most jobs can be narrowed down on the phone.

02

We look at it properly

A real diagnosis before a price, and a straight answer if it is not worth doing.

03

A written quote

Itemised, so you can see what you are paying for.

04

The job, and the paperwork

Certificates where the work needs them, and what will need attention next.

Coverage

Where we do this work

Across Norwich and the whole of Norfolk. If you are on the edge of the county, call and ask — we will tell you honestly whether we are the right people.

  • Norwich
  • Wymondham
  • Dereham
  • Attleborough
  • Aylsham
  • North Walsham
  • Cromer
  • Diss
  • Loddon
  • Long Stratton
  • Watton
  • King's Lynn

All areas we cover →

Need this doing?

Call and describe the problem — you will speak to an engineer, not a call centre. Written quotes, no estimates over the phone.

Call now Get a quote